2023-05 Public Report

Unscheduled:

  • May 25th: The link between Varla and Holmagärde flapped. The flap was due to a planned but unannounced maintenance by a sub provider.
  • May 23rd: The optical node in Tuggen (TGN3) was unreachable due to unannounced power maintenance.
  • May 22nd: The link between Varla and Holmagärde flapped for a brief minute. RFO is unknown.
  • May 14th: Link was down in Kiruna for SSC. RFO unkown.
  • May 11th: The link to the RISE office in Linköping was down due to a power outage at the customers site.
  • May 9th: Routing issues between campuses in Växjö and Kalmar for Linnéuniversitetet due to tunnel outage.
  • May 7th: We got Major FPC Error on FPC9 in our router in Stockholm. Resolved the issue by rebooting the FPC.
  • May 5th: Outage on the link between Åre and Östersund due to a fiber cut.
  • April 28th: There was a minor alarm on the router kka8-r1. It has not happened again so we are closing the case.

Scheduled:

  • May 29th: Provider performed fiber maintenance in Västerås affecting RISE at Jonasborgsvägen 26.
  • May 29th: SUNET performed software upgrades of optical node in Ballerup.
  • May 29th: The BGP configuration between SUNET and SMHI is optimised. 
  • May 29th: SUNET performed software upgrades of optical node in Linköping.
  • May 28th: Provider performed rerouting maintenance in Linköping affecting dark fiber between Linköping and Norrköping (Node A - Datorhall Ahus, Node B -Kopparhammare)
  • May 25th: SUNET upgraded the optical equipment in Malmö and Ørestad to a newer software release.
  • May 23rd: Provider performed an upgrade maintenance in Lund. No outage observed.
  • May 23rd: Hardware maintenance performed in Nybro to replace a new ROADM. No outage observed.
  • May 23rd: Provider performed an upgrade maintenance in Stockholm and Göteborg.
  • May 22nd: Provider performed a Network maintenance in Piteå.
  • May 22nd: Provider performed rerouting of circuits that will affect link between Borgvik-Hanebol.
  • May 21st: Provider performed internal upgrade maintenance in Stockholm. No outage observed
  • May 21st: Provider performed an internal upgrade maintenance in Umeå and Örnsköldsvik.
  • May 17th: Provider performed an upgrade maintenance in Stockholm and Göteborg.
  • May 16th: Provider performed fiber maintenance in KIR4 (Svappavaara) and PAJ1 (Junosuando) affecting SUNET IP backbone.
  • May 16th: Provider performed an upgrade maintenance that affected ethernet capacity links for RISE, RA and UMU.
  • May 15th: Provider perform a fiber maintenance that affected the customer connection in Umeå.
  • May 15th: SUNET performed an emergency upgrade maintenance to upgrade the firmware on one of our routers in Linköping. No outage observed.
  • May 14th: Provider performed internal upgrade maintenance that affected the customer connection to RISE in Linköping.
  • May 14th: Provider performed maintenance on optical cable that affecting the link between KTH Stockholm and Södertälje campus
  • May 14th: Supplier perform an internal upgrade maintenance that affected the customer connection to RISE in Norrköping.
  • May 11th: SUNET upgraded the optical equipment at Kimstad site.
  • May 11th: Provider preformed rerouting of circuits between Boden and Luelå.
  • May 11th: Provider preformed upgrade maintenance between Stockholm - Sköndal. No outage observed.
  • May 10th: Provider performed a fiber maintenance in Borås that affected the uplink fiber for RISE in the office in Borås.
  • May 10th: Provider performed a fiber maintenance in Borås that affected the fiber between Borås - Skövde
  • May 9th: Provider performed an upgrade maintenance that affected ethernet capacity links for KAU, RA and UMU.
  • May 9th: SUNET upgraded the optical equipment at Nybro site.
  • May 9th: Provider performed a rerouting maintenance that affected the fiber between Boden - Luleå.
  • May 8th: Naturhistoriska riksmuseet preformed a power maintenance on their site.
  • May 8th: We performed configuration changes on the router lla1-r2.
  • May 8th: Closing this ticket. Merged SUNET-478 with SUNET-472. We will track the maintenance in SUNET-472.
  • May 7th: Provider performed an upgrade maintenance affecting the link between Musikhögskolan in Arvika and Karlstads universitet.
  • May 4th: SUNET performed software upgrades of optical nodes in Sundsvall, Östersund and Örebro.
  • May 4th: Provider performed a power maintenance on their sites in Dingle and Uddevalla. No outage was observed.
  • May 3rd: Provider performed upgrade maintenance.
  • May 3rd: SUNE performed software upgrades of optical nodes in Västerås and Eskilstuna.
  • May 3rd: The ADVA optical nodes JFS-ILA1, ARS-ILA1 and KFS-ILA1 were upgraded to a newer software version. No outage observed.
  • May 3rd: SUNET performed maintenance on node KLX1-RM1 in Kalix.
  • May 3rd: Provider performed power maintenance in Dingle and Strömstad. No outage was observed.
  • May 2nd: Provider performed an upgrade maintenance that affected ethernet capacity links for UMU and RA.
  • May 2nd: Provider performed OTDR measurements on fiber link between Kalix - Luleå.
  • May 2nd: The optical equipment in Malmö was upgraded to a newer software version.
  • May 2nd: The ADVA optical nodes DU1, DU2, DU3 and DU4 were upgraded to a newer software version. No outage observed
  • May 2nd: The ADVA optical nodes MUN17-ILA1, NOR1202-ILA1, STD24-ILA1 and UDD48-ILA1 were upgraded to a newer software version. No outage observed.
  • May 2nd: Provider rebuilt A and B power on their sites in Rakkestad, Norway and Strömstad, Sweden. There was no outage other than loss of redundant power.
  • May 2nd: Provider performed upgrade maintenance in Karlstad.
  • May 2nd: Provider performed upgrade maintenance.
  • May 1st: Provider performed network maintenance in Skellefteå affecting connection to RISE.
ScopeUnscheduledScheduledTotal
Hardware3 pcs 06:228 pcs 12:5011 pcs 19:12
Link5 pcs 13:2518 pcs 19:3023 pcs 1d 08:55
Other0 pcs4 pcs 00:214 pcs 00:21
Routing1 pcs 02:323 pcs4 pcs 02:32
Software0 pcs3 pcs3 pcs