2023-03 Public Report

Unscheduled:

  • March 27th: The router slu-ume-r2 beacame unreachable.
  • March 26th: Hardware Error observed on FPC3 in router umu-r1. According to provider, this is a transient issue.
  • February 21st: rpe_veto lead to iBGP sessions down in router fln4-r1 most likely related due to unannounced work at site but the RFO is undetermined.

Scheduled:

  • March 30th: On of the optical components at Jönköping was upgraded to a newer software release.
  • March 22nd: SUNET performed a maintenance to optimize the optical channel on the link between Kristianstad and Karlskrona.
  • March 14th: SUNET upgraded the software version at one of the optical components in Lund.
  • March 8th: NUNOC performed software maintenance to upgrade the optical nodes in Tandö and Rätan. No outage observed.
  • March 8th: SUNET performed upgrade maintenance on the optical components in Lund.
  • March 3rd: NUNOC performed remote restart of module 1/1. The problem has been solved.
  • March 1st: SUNET performed a maintenance to optimize the optical channel on the link between Kristianstad and Karlskrona
ScopeUnscheduledScheduledTotal
Hardware1 pcs1 pcs2 pcs
Link0 pcs0 pcs0 pcs
Other1 pcs 09:590 pcs1 pcs 09:59
Routing1 pcs2 pcs 01:263 pcs 01:26
Software0 pcs2 pcs 01:262 pcs 01:26
  • No labels