2023-01 Public Report

Unscheduled:
  • January 24th: Router irf-r2 was unreachable due to overload of memory and CPU. The router has now been stable for 24 hours, after a configuration change. 
  • January 7th: Router was down due to scaling/memory issue. Solved after memory health became normal again.
  • January 2nd: Lost management to ARE64. This was due to environmental issues at the site.
Scheduled:
  • December 21st: Network Freeze has ended.
ScopeUnscheduledScheduledTotal
Hardware3 pcs 01:160 pcs 3 pcs 01:16
Link0 pcs 0 pcs 0 pcs
Other0 pcs 0 pcs 0 pcs
Routing0 pcs 0 pcs 0 pcs
Software0 pcs 0 pcs 0 pcs
  • No labels