Unscheduled:
  • July 25th: The outage was due to a power issue caused by lightning at the site.
  • July 24th: The fiber between SUNET and SMHI in Norrköping was down due to a fiber outage. Fiber is repaired and services are restored.
  • July 19th: There was a network issue to reach hosts that resided in MS Cloud which was later resolved.
  • July 18th: Link down between Stockholm and Västerås was flapping due to human error by the third provider.
  • July 17th: The link between Stockholm and Norrköping was down due to a higher attenuation.The signal level has improved without any intervention on the fiber and services have restored and are stable.
  • July 8th: Link between Falun - Örebro was down due to error on FPC. Issue was cleared after restarting FPC.
  • July 6th: optical system in Arvidsjaur has been restored
  • July 5th: We've got a three minor alarms regarding fabric plane that report issues with network cards already removed from the unit. These alarms have no impact on services or routing.
  • July 3rd: Issues with IDP do to software changes.
  • June 27th: The link between Östersund - Järpen went down due to unannounced maintenance work carried out by provider.
Scheduled:
  • July 23rd: The MGMT-module in our optical node in Linköping was swapped. No outage observed.
  • July 22nd: Our provider performed fiber maintenance affecting the fiber between Järpen - Östersund. No fiber outage was observed.
  • July 18th: The provider performed emergency link maintenance between Kolstad and Linköping
  • July 11th: Maintenance postponed, a new ticket will be sent out for the new maintenance window.
  • July 11th: The connection between MIUN and SUNET in Sundvall has been migrated over to new equipment.
  • July 5th: SUNET migrate services in Göteborg over to SUNET-CD
  • July 1st: SUNET performed an emergency link maintenance to move connections to SUNET-CD in Västerås.
ScopeUnscheduledScheduledTotal
Hardware3 pcs 00:312 pcs 5 pcs 00:31
Link5 pcs 01:385 pcs 09:5810 pcs 11:36
Other1 pcs 01:060 pcs 1 pcs 01:06
Routing1 pcs 0 pcs 1 pcs
Software0 pcs 0 pcs 0 pcs