2026-06 Public Report
Unscheduled:
- June 29th: Experienced link flap on the backbone link between Karlstad - Luleå. RFO unknown.
- June 24th: The CPE located at RISE in Örnsköldsvik became unreachable due to a fiber outage.
- June 18th: The link between Årnes - Kongsvinger was down due to planned maintenance.
- June 17th: Hardware errors were experienced in optical equipment in Västerås, the issue was resolved after replacing the SCU card.
- June 10th: Link flapping was experienced on the Kiruna–Falun and Sundsvall–Falun connections, the issue was resolved by adjusting power levels at both ends of the links.
- June 9th: Multiple links in Malmö were down due to unannounced provider fiber maintenance.
- June 4th: Site temperature exceeded threshold in Järpen due to failure of the cooling unit due to local power interruption.
- June 1st: The links Järpen–Kopperå and Trondheim–Kopperå were down after planned maintenance (SUNET-3032) due to faulty fiber measurement readings between Kopperå and Järpen nodes.
- May 31st: The link between Narvik-Abisko was down due to an unannounced planned maintenance.
- May 29th: The Link between SLU and UU flapped. RFO unknown.
- May 9th: Hardware errors in Trollhättan resolved after emergency hardware maintenance.
Scheduled:
- June 29th: SUNET performed emergency power maintenance in Stockholm.
- June 29th: SUNET performed Emergency Hardware Maintenance to replace faulty roadm card in Norrköping.
- June 26th: Sunet performed hardware maintenance in Dövestad that affected the link between Hedenlunda and Dövestad.
- June 25th: Provider performed fiber maintenance that affected the link between Härnösand - Örnsköldsvik.
- June 24th: Provider performed fiber maintenance between Norrköping - Visby.
- June 23rd: SUNET performed software upgrade in Stockholm.
- June 23rd: Provider performed fiber maintenance in Västerås, affecting our link between Stockholm - Västerås.
- June 22nd: Provider performed fiber maintenance that affected the link between Ånge - Laforsen.
- June 22nd: SUNET performed router reboot to resolve the hardware issues in Kristianstad.
- June 21st: Provider performed fiber maintenance that affected the Göteborg site.
- June 17th: SUNET moved equipment in Västerås, affecting attached services.
- June 16th: SUNET performed maintenance to troubleshoot fiber issues affecting the link between Överum and Simpevarp.
- June 15th: SUNET performed maintenance to troubleshoot fiber issues affecting the link between Örnsköldsvik - Härnösand.
- June 12th: Provider performed fiber maintenance that affected the link between Hörby - Gussa and Svenstorp - Alvesta.
- June 11th: Provider performed fiber maintenance between Furudal - Lobonäs - Laforsen.
- June 11th: SUNET performed wavelength rerouting between Stockholm and Copenhagen.
- June 10th: Provider performed cable work in Stockholm, affecting the links to Marie Cedershiöld University and the SUNET backbone.
- June 10th: Provider performed power maintenance in Örebro. No service impact observed.
- June 9th: Provide performed fiber maintenance that affected the link between Piteå - Skellefteå.
- June 9th: Provider performed fiber maintenance between Hedenlunda - Kolbotten.
- June 8th: SUNET performed troubleshooting maintenance in Gävle to resolve the issue.
- June 8th: Provider performed a cable maintenance in Norrköping.
- June 5th: SUNET performed maintenance to upgrade the bandwidth in Stockholm.
- June 3rd: Provider performed fiber maintenance between Norrköping - Nyköping.
- June 3rd: Provider performed emergency attenuation work on the Norrköping - Visby circuit.
- June 2nd: SUNET performed emergency hardware maintenance in Trollhättan, fan tray was replaced.
- June 2nd: Provider performed maintenance between the fiber stretch in Svappavaara and Junosuando in Sweden.
- June 1st: Errors were observed on the router in Göteborg, issue was resolved by replacing the router.
- May 31st: Provider performed cable works on the link betwen Järpen - Meråker.
| Scope | Unscheduled | Scheduled | Total |
|---|---|---|---|
| Hardware | 3 pcs 5d 20:18 | 7 pcs 01:27 | 10 pcs 5d 21:45 |
| Link | 8 pcs 2d 10:12 | 20 pcs 3d 16:51 | 28 pcs 6d 03:03 |
| Other | 0 pcs | 0 pcs | 0 pcs |
| Routing | 0 pcs | 0 pcs | 0 pcs |
| Software | 0 pcs | 0 pcs | 0 pcs |
Contact us
Please contact info@sunet.se