Unscheduled:
- July 30th: Provider has temporarily fixed the cable. It will be permanently repaired during upcoming maintenance work.
- July 15th: The link between Östersund and Midskog was down because a field technician moved the wrong fiber patch while troubleshooting for another user.
- July 13th: The link between hh-r22 and lnd88-r11 was down. After signal optimization, the link was restored.
- May 20th: The links between Jönköping - Rusken and Rusken - Alvesta were down due to maintenance by the provider.
- January 10th: We observed errors on the link between Falun and Sundsvall. After signal optimization, the link has been error-free.
Scheduled:
- July 31st: ALM installation completed at the STHB site.
- July 31st: Provider carried out an emergency repair of broken fiber in Lund, affecting the links towards ESS.
- July 29th: SUNET deployed active live monitoring units for all fiber stretches on the circuit going through Borgvik.
- July 28th: SUNET deployed active live monitoring units for all fiber stretches on the circuit going through Örebro.
- July 23rd: The fiber maintenance between Kalix and Luleå was cancelled by the provider.
- July 21st: SUNET deployed active live monitoring units for all fiber stretches on the circuit going through Halmstad.
- July 18th: SUNET deployed active live monitoring units for all fiber stretches on the circuit going through Mörarp.
- July 17th: SUNET deployed active live monitoring units for all fiber stretches on the circuit going through Dövestad, Kimstad, Esklistuna, Vårsta & Stockholm.
- July 17th: SUNET deployed active live monitoring units for all fiber stretches on the circuit going through Vårsta - Norrköping.
- July 16th: SUNET deployed active live monitoring on 2 sites. Due to access issues we were unable to access the last site. This will be remedied tomorrow.
- July 16th: SUNET deployed active live monitoring units for all fiber stretches on the circuit going through Skellefteå.
- July 15th: SUNET migrated 1G connections in Stockholm over to SUNET-CD infrastructure.
- July 15th: Provider troubleshot a fiber issue on the link between Lund and Mörarp. The issue was resolved after switching to new fiber.
- July 10th: SUNET migrated 1G connections in Stockholm over to SUNET-CD infrastructure.
- July 9th: SUNET deployed active live monitoring units for all fiber stretches on the circuit going through Jönköping.
- July 8th: SUNET deployed active live monitoring units for all fiber stretches on the circuit going through Göteborg.
- July 7th: SUNET re-routed the Géant Alien Wavelengths between Copenhagen and Stockholm back to their original optical path.
- July 4th: SUNET deployed active live monitoring units for all fiber stretches on the circuit going through Kalmar.
- July 3rd: SUNET deployed active live monitoring units for all fiber stretches on the circuit going through Strömstad, Dingle & Uddevalla.
- July 2nd: SUNET deployed active live monitoring units for all fiber stretches on the circuit going through Dingle.
- July 1st: SUNET deployed active live monitoring units for all fiber stretches on the circuit going through Strömstad.
- July 1st: SUNET deployed active live monitoring units for all fiber stretches on the circuit going through Simpevark.
| Scope | Unscheduled | Scheduled | Total |
|---|---|---|---|
| Hardware | 0 pcs | 1 pcs 00:52 | 1 pcs 00:52 |
| Link | 5 pcs 41d 08:17 | 21 pcs 1d 11:30 | 26 pcs 42d 19:47 |
| Other | 0 pcs | 0 pcs | 0 pcs |
| Routing | 0 pcs | 0 pcs | 0 pcs |
| Software | 0 pcs | 0 pcs | 0 pcs |